Commissioning is one of the key steps towards putting into service a new nuclear facility, or a new system, structure or component within an existing facility. Commissioning activities need to be planned early in the design and procurement process, with careful consideration of eventual acceptance criteria and test methods. This publication describes commissioning in its basic form, the commissioning process specific to nuclear power plants (NPPs), the relevant management system requirements, typical organizational models and critical human resources issues.
It also provides details on experience and lessons learned obtained in IAEA Member States. The publication will be of use to all stakeholders involved in the commissioning of NPPs, including owner operators, contractors, engineers, regulatory bodies and vendors.
| ISBN: | 9789201028167 |
| Publication date: | 30th June 2018 |
| Author: | IAEA |
| Publisher: | International Atomic Energy Agency |
| Format: | Paperback |
| Pagination: | 277 pages |
| Series: | IAEA Nuclear Energy Series |
| Genres: |
Energy industries and utilities Nuclear physics Nuclear power and engineering |
Commissioning is one of the key steps towards putting into service a new nuclear facility, or a new system, structure or component within an existing facility. Commissioning activities need to be planned early in the design and procurement process, with careful consideration of eventual acceptance criteria and test methods.
Commissioning Guidelines for Nuclear Power Plants features in the following genres: Energy industries and utilities, Nuclear physics, Nuclear power and engineering
Paperback. Not Available.
Commissioning Guidelines for Nuclear Power Plants was written by IAEA and published by International Atomic Energy Agency
Commissioning Guidelines for Nuclear Power Plants has 277 pages
Yes it is part of IAEA Nuclear Energy Series series