10% off all books and free delivery over £50
Buy from our bookstore and 25% of the cover price will be given to a school of your choice to buy more books. *15% of eBooks.

Resource-Constrained Project Scheduling

View All Editions (1)

The selected edition of this book is not available to buy right now.
Add To Wishlist
Write A Review

About

Resource-Constrained Project Scheduling Synopsis

Within a project human and non-human resources are pulled together in a tempo- raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project.

Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri- tical Path Method) were developed. Given deterministic durations and precedence- constraints the minimum project length, time windows for the start times and critical paths can be calculated.

At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta- distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date.

By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).

About This Edition

ISBN: 9783540578345
Publication date:
Author: Arno Sprecher
Publisher: Springer an imprint of Springer Berlin Heidelberg
Format: Paperback
Pagination: 142 pages
Series: Lecture Notes in Economics and Mathematical Systems
Genres: Production and industrial engineering
Management decision making
Management of specific areas
Business mathematics and systems
Operational research
Business applications

Frequently asked questions